Sunday, June 26, 2011

Milestone #3 IP1

Present Designs to ASB and give cost estimation

Austin Chick and I prepared handouts for all of ASB to pass around during the presentation that included the complete costs of all the apparel which also included the suggested selling price to each student at AHS. ASB  merely agreed with our designs and cost. Executive was actually confused by our motives for scheduling our presentation in the meeting. We then had to clarify that it was best cover every aspect of authority before getting the designs passed especially since they, along with the rest of the student body, was the primary audience for sale of these clothes. The meeting was, at best, dumbfounding, because of the confusion among ASB. Our next move is to get the administration to give the green light for our project.

No comments:

Post a Comment